IntermediateSITUATIONAL
Your company is planning to launch a new product line with uncertain demand and a 16-week lead time from an overseas supplier. You are responsible for designing the initial supply chain setup. What specific decisions would you make regarding sourcing, transportation mode, inventory positioning, and contingency planning to minimize both stockouts and excess inventory in the first six months?
Supply Chain Manager
General
Related Questions

On your resume you mention working on a cross-functional project (e.g., involving multiple teams or stakeholders). Describe a situation from that project where priorities conflicted—how did you navigate the trade-offs and what was the final outcome?

IntermediateSITUATIONAL

Walk me through a recent multi-channel digital marketing campaign you managed end-to-end. How did you set objectives, choose channels, allocate budget, and measure success?

IntermediateBEHAVIORAL

In your resume you note improving or optimizing [a process, KPI, or metric]. What specific baseline metrics did you start from, what steps did you personally take, and how did you verify that the improvement was due to your changes rather than external factors?

IntermediatePROBLEM_SOLVING

Based on your hydrology and irrigation engineering background, explain how you would estimate the irrigation water requirement for a kharif crop in a semi-arid region of Gujarat. Walk me through each step: from reference evapotranspiration estimation, crop coefficient selection, effective rainfall calculation, to arriving at canal discharge for a given command area.

IntermediateTECHNICAL

In your civil engineering studies, what specific design coursework or project work did you complete related to irrigation channels or canals (e.g., design of lined/unlined canals, distributaries, minors)? Describe one such design in detail, including how you determined discharge, permissible velocity, section dimensions, and lining choice for Gujarat-type soil and climate conditions.

IntermediateTECHNICAL