IntermediateBEHAVIORAL
Describe a time you turned around a slipping quarterly renewal with a strategic client — what specific steps did you take to recover the deal, how did you coordinate internal teams, and what was the final outcome?
Account Executive
General

Sample Answer

Situation: At General Systems, a strategic client (MegaRetail Inc., $4.2M ARR account) signaled they would not renew in Q3 after product adoption fell 30% and support tickets rose 220% over two months. Task: As the named Account Executive, I owned renewal recovery and stakeholder alignment with 14 days to save the account. Action: I ran a rapid diagnostics using Salesforce and Gainsight to map usage dip, aggregated top 10 support issues via Zendesk, and held a war-room meeting with Product, CS, and Engineering. I led executive sponsorship outreach: scheduled a C-level call between our VP of Customer Success and MegaRetail’s Head of Ops within 48 hours. I proposed a targeted remediation plan — 6-week success playbook including two on-site training days, a custom integration patch scoped by Engineering, and a 10% short-term credit tied to adoption milestones tracked in Gainsight. I used Gong recordings to coach the renewal conversation and updated the SLA in DocuSign. Result: Within three weeks adoption recovered 45%, support tickets fell 60%, and MegaRetail renewed for 12 months at 95% of prior ARR with a roadmap commitment worth $350K in upsell pipeline over six months.

Keywords

Use of specific tools: Salesforce, Gainsight, Zendesk, Gong, DocuSignQuantified business impact (ARR, % adoption change, ticket reduction)Clear personal ownership and timeline (14 days, 48-hour exec call)Cross-functional coordination with Product, CS, Engineering, and ExecsOutcome with numbers: renewal % of ARR and upsell pipeline value
Related Questions

Walk me through a recent multi-channel digital marketing campaign you managed end-to-end. How did you set objectives, choose channels, allocate budget, and measure success?

IntermediateBEHAVIORAL

In your resume you note improving or optimizing [a process, KPI, or metric]. What specific baseline metrics did you start from, what steps did you personally take, and how did you verify that the improvement was due to your changes rather than external factors?

IntermediatePROBLEM_SOLVING

Based on your hydrology and irrigation engineering background, explain how you would estimate the irrigation water requirement for a kharif crop in a semi-arid region of Gujarat. Walk me through each step: from reference evapotranspiration estimation, crop coefficient selection, effective rainfall calculation, to arriving at canal discharge for a given command area.

IntermediateTECHNICAL

In your civil engineering studies, what specific design coursework or project work did you complete related to irrigation channels or canals (e.g., design of lined/unlined canals, distributaries, minors)? Describe one such design in detail, including how you determined discharge, permissible velocity, section dimensions, and lining choice for Gujarat-type soil and climate conditions.

IntermediateTECHNICAL

On your resume you mention working on a cross-functional project (e.g., involving multiple teams or stakeholders). Describe a situation from that project where priorities conflicted—how did you navigate the trade-offs and what was the final outcome?

IntermediateSITUATIONAL