Skip to main content
VirtualInterview.ai

Software & Engineering

Electrical engineer interview questions and mock interview

Electrical engineer interviews ask you to work through a calculation out loud and explain the safety rules you work under. Expect cable sizing, protection, power factor and earthing for power and building-services roles; PLC fault-finding and commissioning for controls roles; and a schematic or test question for electronics design.

The practice link on this page opens a technical round with the role set to Electrical Engineer. The AI interviewer opens with a short applied question about the job and follows up on the step you skipped, such as which derating factor you applied. Electrical Engineer as a title does not bring a coding exercise with it. Every answer is scored from 0 to 100 for relevance, depth and clarity, and the round weighs your method, technical accuracy and how clearly you explain it.

Practice this role with an AI interviewer

Free plan: 2 interviews a month, free account, no card.

What the loop usually looks like

  1. Recruiter or HR screen (20 to 30 minutes). Your area (power, building services, controls, electronics), the standards you design to, software (for example load-flow, lighting or PLC tools), site work, licences and notice period.
  2. Technical interview (45 to 90 minutes). Calculations out loud: cable sizing, fault level, power factor, a protection question, a single-line diagram you drew. Controls roles get a fault-finding story or a ladder-logic question. Safety comes up in every version: lockout, permits and arc flash.
  3. Design review, site or lab visit, manager (Half a day or less). A drawing or schematic to critique, a walk round a switchroom or panel shop, or a lab test. The manager asks how you handle a design comment you disagree with and a commissioning problem under pressure.

What interviewers score

  • Calculation method stated before the number
  • Safety discipline: isolation, lockout and arc flash
  • Standards named correctly for the region and job
  • Fault-finding by evidence, not by swapping parts

What interviewers probe at each level

Power and building services

Cable sizing, voltage drop, fault level, protection coordination, power factor correction, earthing and the wiring rules for your region (NEC in the US, IEC-based rules elsewhere). Follow-ups ask which check governed the cable size and what you do when the protection study shows a nuisance-tripping risk.

Controls and automation

PLC and drive fault-finding, interlocks, safety circuits, loop checks, commissioning and handover. Interviewers want a story with evidence: what the I/O showed, what you measured and how you proved the fix. If you set the title to automation engineer, or your resume lists Python or C++, the practice round may add a short coding question, as many of these interviews do. Controls Engineer on its own does not.

Electronics design

A schematic review, component selection and derating, power supply design, EMC and how you debug a board. Expect “why that part?” and “how did you test it?” on every line of your resume.

Mistakes that cost candidates this round

  • Sizing a cable from current alone and forgetting derating, voltage drop and fault withstand.
  • Quoting a standard’s number without saying which standard and edition it comes from.
  • Describing work on equipment without mentioning isolation, lockout and testing for dead.
  • Telling a fault-finding story where the fix was swapping parts until it worked.
  • Losing a design review argument and having nothing to say about what you learned from it.
  • Leaving harmonics and resonance out of a power factor correction answer.

How do you walk through cable sizing in an interview?

Interviewers who ask “explain cable sizing” want the sequence of checks, with your standard named. Say it in this order: the design current of the load; the installation method and the derating factors for grouping, ambient temperature and any thermal insulation; the protective device rating; voltage drop to the load; and the short-circuit or fault withstand of the cable for the device’s clearing time. The biggest size from those checks is the answer, and a strong candidate says which check governed.

A worked example (our own numbers). A 75 kW three-phase motor on 400 V, power factor 0.85, efficiency 0.93. Current is 75,000 ÷ (√3 × 400 × 0.85 × 0.93) ≈ 137 A, though for a real motor you use the nameplate full-load current. If the cable is grouped with others (factor 0.8) in a warm space (factor 0.94), the tabulated rating you need is 137 ÷ (0.8 × 0.94) ≈ 182 A. You then pick the size from your standard’s tables, check voltage drop over the run length, including the starting current if it is direct-on-line, and check that the cable withstands the fault until the protection clears it.

Power factor correction is the other common calculation. The capacitor kvar is P × (tan φ1 − tan φ2). For 400 kW at 0.75 corrected to 0.95: tan φ1 ≈ 0.882, tan φ2 ≈ 0.329, so about 400 × 0.553 ≈ 221 kvar. Then say what can go wrong: over-correction at light load, and resonance with harmonics from drives, which is why many sites use automatic stepped banks with detuning reactors.

Safety questions: arc flash and lockout

Expect at least one safety question, and expect it to be a scenario: a supervisor wants a panel worked on live, or a colleague skipped a step. In the US, OSHA’s hazardous energy standard (29 CFR 1910.147) sets the order of the lockout procedure: preparation for shutdown, shutdown, isolation of the energy sources, applying lockout or tagout devices, releasing or restraining stored energy, and verifying isolation before work starts. Naming those steps in order, and saying you test for dead before touching anything, answers most lockout questions.

Arc flash questions ask how you would decide what protection a task needs. IEEE 1584-2018 is the guide that gives designers and facility operators the models for calculating arc-flash incident energy and the arc-flash hazard distance. Which tasks need which protection is then set by workplace rules: NFPA 70E in the US, national regulations elsewhere. A strong answer starts with removing the hazard, by de-energising the equipment, and treats protective clothing as the last line.

Sources: OSHA, 29 CFR 1910.147 The control of hazardous energy (lockout/tagout); IEEE, 1584-2018 Guide for Performing Arc-Flash Hazard Calculations

Freshers, standards and a prep plan

Freshers get the fundamentals applied: why we transmit at high voltage, how a transformer, an induction motor and a circuit breaker work, star and delta, and earthing systems. Pick one project and one internship and know every number in them. Graduate engineer trainee interviews in power and manufacturing companies follow the same pattern with more HR questions.

Name your region’s rules correctly. The US uses the National Electrical Code (NFPA 70) for installations; most other countries use wiring rules based on the IEC 60364 series or a national code. Say which one you used on a project rather than mixing them.

A ten-day plan: days 1 to 3, write up two projects with one calculation each; days 4 to 6, redo cable sizing, fault level, voltage drop and power factor by hand and say each step aloud; day 7, prepare a lockout story and a fault-finding story with evidence; days 8 to 10, run the technical round here, then repeat the weakest answer with a tougher interviewer.

10 electrical engineer interview questions and model answers

1. Walk me through how you would size a cable for a 75 kW motor.

Technical. What they are testing: The full sequence of checks, not a formula.

I start with the design current, which here is about 137 A from the power and power factor, but I would use the nameplate full-load current. Then I apply derating for grouping, ambient and the installation method, so if those factors were 0.8 and 0.94 I would need a tabulated rating of about 182 A. I pick the size from the tables in our standard, check voltage drop, including starting if it is direct-on-line, and check fault withstand for the breaker’s clearing time. I say which check set the final size.

2. How do you approach protection coordination between a main breaker and feeder breakers?

Technical. What they are testing: Selectivity thinking with real data.

I start from the single-line diagram, the fault levels at each board and the device ratings and settings. I plot the time-current curves so the feeder device clears a fault on its circuit before the upstream device moves, with a margin between curves, and I check both maximum and minimum fault currents. Where curves overlap, I change settings or the device type. On one job, an instantaneous setting on the main would have tripped for a feeder fault, so we raised it after checking the cable could still be protected.

3. A site has a power factor of 0.75 on 400 kW. How much correction do you need to reach 0.95, and what would worry you?

Technical. What they are testing: The calculation and the risks.

Kvar equals P times the difference of the tangents: tan φ goes from about 0.882 to 0.329, so about 221 kvar. I would install it as an automatic stepped bank so it does not over-correct at light load. My worry is harmonics: with several drives on site, capacitors can resonate, so I would measure the harmonic levels first and probably specify detuning reactors.

4. Your supervisor asks you to work on a live panel to avoid shutting down production. What do you do?

Situational. What they are testing: Safety judgement under pressure.

I would say no to working on it live unless it is truly infeasible to de-energise, and production pressure is not that reason. I would explain the risk, propose a short planned shutdown at a time that hurts least, and lock out and test for dead before work. If energised work were truly justified, it would need the site’s energised-work permit, an arc-flash assessment, the right protection and a second person, and it would be signed off above both of us.

5. Tell me about a time you found a lockout step had been skipped.

Behavioral. What they are testing: Speaking up and fixing the system.

A contractor had isolated a conveyor at the local stop but had not locked the isolator. I stopped the work, had them apply their lock and test, and reported it as a near miss. Afterwards we found our job pack did not list the isolation point clearly, so I added isolation points to the job pack with photos. I tell the panel both parts: the action that day and the change that stopped it happening again.

6. Tell me about a PLC fault you found. How did you narrow it down?

Domain. What they are testing: Evidence-based fault-finding.

A filler kept stopping on a “guard open” fault with the guard shut. I watched the input in the PLC online and saw it flicker, so it was wiring or the switch, not the logic. With the line isolated I checked the switch and the terminations, found a loose ferrule in a junction box that vibrated, re-terminated it and added it to the inspection list. I explain the evidence at each step, because the panel wants method, not luck.

7. What is the purpose of earthing, and how would you check an earthing system?

Technical. What they are testing: Safety fundamentals with practical testing.

Protective earthing gives fault current a low-impedance path so the protective device operates fast enough to remove dangerous touch voltages, and bonding keeps metalwork at the same potential. I would check continuity of protective conductors, measure earth fault loop impedance against what the protective device needs to disconnect in time, and test the electrode resistance where there is one. The limits come from the wiring rules the installation is designed to, so I name those.

8. Tell me about a design review where your proposal was rejected.

Behavioral. What they are testing: Taking feedback and learning from it.

I proposed a single larger transformer for a building extension to save cost. The reviewer pointed out that it left no redundancy for a critical process and raised the fault level beyond the switchgear rating. They were right on both. We went with two units. Now I check fault levels and redundancy requirements before I present a cost option, and I ask early who owns the reliability requirement.

9. During commissioning a new motor trips on overload within minutes. What do you check?

Situational. What they are testing: Commissioning discipline.

I would check the overload setting against the nameplate, then measure the current on all three phases. Unbalanced current points to supply or connection problems. High current on all phases points to the load, so I check that the motor rotates the right way, that the driven equipment is free, and that the pump or fan is at the duty point the design assumed. I keep a record of what I measured for the handover pack.

10. Talk me through a single-line diagram you drew.

Domain. What they are testing: Ownership of a real design.

I describe the supply, the main switchboard, the feeders and the main loads, and the protective devices on each, with their ratings. Then I say what decisions the diagram reflects: why that transformer size, where the fault level was highest, and what we changed after the protection study. I bring one number for each decision so the panel can see I did the calculations.

Frequently asked questions

Will I get a coding question in an electrical engineer interview?

Not in this practice round for an Electrical Engineer. If you set the title to automation, embedded or firmware engineer, or your resume lists Python or C++, the practice round may add a short coding question. Controls Engineer alone does not. Many real interviews for those roles do the same.

What do freshers get asked in electrical engineering interviews?

Fundamentals applied: transformers, induction motors, circuit breakers, star and delta, earthing, why transmission is at high voltage, plus your final-year project and internship. Practise one calculation out loud. Graduate engineer trainee interviews add HR questions on relocation and bonds.

Should I talk about NEC or IEC standards?

Talk about the one you actually used, and name it. The US uses the National Electrical Code (NFPA 70); most other countries use rules based on the IEC 60364 series or a national code. Interviewers notice when a candidate mixes the two.

Does the AI check my answer against the electrical code?

No. The interviewer scores your answer and follows up when it stays general, but it does not check figures against NEC, IEC or OSHA text. Check the numbers you quote against your own standard before the real interview.